Name: Taurus

Work/project: Factory

Location:

Mandirituba / PR

Porto Alegre / RS

Description:

  • Three industrial and administrative buildings with precast concrete structure;
  • Painted visible concrete block closing;
  • Metal roofing;
  • Industrial flooring of reinforced concrete;
  • Aluminum frames;

Area: 19,000 m²

Execution Period: 210 days

Year: 2001

« Voltar